To be completed upon arrival in Ensenada
Haul-out
• Paint bottom
• Install two transducers with through-hulls
• Replace through-hulls and replace/rebuild sea cocks.
• Install Inter Phase 180se sonar.
• Prep and paint boat name and port of origin.
To be completed by departure date, (we hope)
1) Fabricate SS Dink holding rack.
2) Replace all remaining plumbing.
Install
• Radar reflector.
• Shaft Shark .
• Manual bilge pumps (2).
• One Hella fan & inline fuses on both.
• Macerator pump.
• Self release EPIRB.
• Cockpit speakers.
• Under cabinet lights.
• Wash-down pump.
• Bilge exhaust system.
• Enlarged cockpit drain system.
• Propane gas detector.
• Anchor bridle
• Anchor bridle cleats.
• Spice rack.
• Calibrate compass.
• New counter tops.
• Formica on shower wall.
Replace engine hoses.
Inspect & tune rigging.